245 1 0 _aIntroduction to Software Project Management and Quality Assurance
_cDarrel Ince, Helen Sharp, Mark Woodman
260 _aLondon
_bMcGraw-Hill
_cc1993
300 _axi,227p.
_bfig.
490 0 _aMcGraw-Hill International Series in Software Engineering
504 _aπεριέχει βιβλιογραφικές αναφορές, περιέχει ευρετήριο : σσ.223 - 227
505 1 _aPreface
_aAcknowledgements
_a1. Software engineering and software development
_a1.1 Requirements analysis
_a1.2 Development of the system and acceptance tests
_a1.3 System design
_a1.4 Detailed design
_a1.5 Implementation
_a1.6 Validation and verification
_a1.7 Maintenance
_a1.8 Summary
_a1.9 Further reading
_aBibliography
_a2. Software project management
_a2.1 Introduction
_a2.2 Management functions
_a2.3 A week in the life of a project manager
_a2.4 The initial planning of a software project
_a2.5 Monitoring the progress of a project
_a2.6 Other life - cycles
_a2.7 Summary
_a2.8 Further reading
_aBibliography
_a3. The information needs of project management
_a3.1 Introduction
_a3.2 System testing
_a3.3 Summary
_a4. Software metrics
_a4.1 Introduction
_a4.2 Measurement and the software project
_a4.3 Software metrics - a researcher's perspective
_a4.4 Result metrics and predictor metrices
_a4.5 Example metrics
_a4.6 Summary
_a4.7 Further reading
_aBibliography
_a5. Project planning
_a5.1 Introduction
_a5.2 The project plan
_a5.3 Summary
_a6. The Phase plan
_a6.1 Introduction
_a6.2 Task identification
_a6.3 Task sequencing
_a6.4 Summary
_a7. Cost estimation, risk asessment and the software project
_a7.1 Introduction
_a7.2 The risk assessment of projects
_a7.3 The cost estimate
_a7.4 Summary
_aBibliography
_a8. Managing a project in practice
_a8.1 Introduction
_a8.2 Practical project management
_a9. Executing the requirements analysis phase
_a9.1 Introduction
_a9.2 Subcontract management
_a9.3 Software system engineering
_a9.4 Quality assurance
_a9.5 Configuration management
_a9.6 Summary
_a10. Executing the system design phase
_a10.1 Introduction
_a10.2 Subcontract management
_a10.3 Software system engineering
_a10.4 Quality assurance
_a10.5 Configuration management
_a10.6 Summary
_a11. Executing the detailed design phase
_a11.1 Introduction
_a11.2 Subcontract management
_a11.3 Software system engineering
_a11.4 Quality assurance
_a11.5 Software production
_a11.6 Configuration management
_a11.7 Summary
_a12. Executing thw implementation phase
_a12.1 Introduction
_a12.2 Subcontract management
_a12.3 Software system engineering
_a12.4 Quality Assurance
_a12.5 Software production
_a12.6 Configuration management
_a12.7 Summary
_a13. What is quality assurance?
_a14. Planning for quality
_a14.1 Introduction
_a14.2 The quality system
_a14.3 The quality plan
_a14.4 Assessing the quality plan
_a14.5 Summary
_aBibliography
_a15. Ensuring quality in the testing process
_a15.1 Introduction
_a15.2 The test plan
_a15.3 Derivation of the system and acceptance tests
_a15.4 Summary
_aBibliography
_a16. An experimental approach to quality assurance
_a16.1 Introduction
_a16.2 The Cleanroom Experiment
_a16.3 Summary
_aBibliography
_a17. Quality standards for software systems
_a17.1 Introduction
_a17.2 One view of software quality assurance
_a17.3 Issues in quality standards for safety -critical software
_a17.4 Issues in quality standards for other software systems
_a17.5 Summary
_aBibliography
_aIndex
650 4 _aCIM
_9119763
650 4 _aCTI
_xDELTA
_9120491
650 4 _aΔιοίκηση και οργάνωση
_953
650 4 _aΔιασφάλιση ποιότητας
_xΕπεξεργασία δεδομένων
_974628
650 4 _aCOMPUTER SOFTWARE
_x QUALITY CONTROL
_9120592
650 4 _aΠΡΟΓΡΑΜΜΑ
_916734
700 1 _aInce, D.
_q(Darrel)
_4aut
_93460
700 1 _aSharp, Helen
_4aut
_9120593
700 1 _aWoodman, Mark
_4aut
_9120594
760 0 _aMcGraw-Hill International Series in Software Engineering
942 _2ddc
_cBK15